How to reroute a river

Two months ago I posted some shots of the Ward Bridge here, shortly before it was closed for work on its concrete piers that have been undermined by Dungeness River flooding. One of the trickier parts of the project was to accomplish the work with minimal disruption to salmon runs that occur in late summer.

The river is being rerouted while work is being undertaken. These big sandbags have been deployed and two excavators were at work when I checked out the project.

They’re working against the clock with a short term permit described here.

5 thoughts on “How to reroute a river”

Comments are closed.