The new span

Railroad Bridge new span

Last winter floodwaters and accompanying debris on the Dungeness River undermined and collapsed part of the Railroad Bridge. The historic trestle survived without damage but the western portion of the span required replacement. A new prefabricated deck has recently been placed on new foundations. This is the portion on the right, above, that does not have tall vertical timbers above the deck.

Railroad Bridge new span 2

Here’s a view from the other side, looking westward along the side of the bridge. A fence at the west end of the trestle makes it hard to get a good shot of the new deck.

This property belongs to the Jamestown S’Klallam Tribe. The Tribe has partnered with a variety of entities to rebuild the bridge. The good news is that the new portion of the bridge was engineered to reduce the number of pilings in the river and removed old ones that had been treated with creosote. This improves salmon habitat and allow a less impeded river flow.

Theme Day: Shop Window

Shop window

The window of Port Book and News in Port Angeles suggested itself for this month’s City Daily Photo theme of “Shop Window.” I liked the holiday tree made from books. Although daylight precluded seeing twinkling holiday lights I liked the reflection of a nearby building.

Click here to see other interpretations of today’s theme from photographers around the world.